COMPANY REGISTRATION NO. 9744607 // ISO 14001:2015
CLEANCYCLES RECOVERY LIMITED // RC 9744607
CIRCULAR METALLURGY & PLANT DECOMMISSIONING

Engineered Plant Teardown & High-Purity Scrap Recovery.

Cleancycles Recovery Limited executes heavy structural dismantling, hydraulic shear cutting, engineered pressure-vessel rigging, and brownfield soil remediation across West Africa’s manufacturing, energy, and petrochemical corridors.

DIVERSION RATE 98.7% Zero-Landfill Target
RECOVERED METALS 310K+ Metric Tons Processed
SAFETY RECORD 0.00 LTIR Incident Rate
UNIT: SENNEBOGEN 824G MATERIAL HANDLER RC 9744607 // FLEET OPS
A green industrial material-handling excavator with a multi-tine grapple sorting through heavy steel scrap in an outdoor recycling yard.
ACTIVE YARD TELEMETRY // FERROUS SORTING

High-Reach Electro-Hydraulic Grapple Recovery

ENGINEERED FIELD SERVICES

Heavy Decommissioning & Remediation Divisions

Every project is executed under strict HAZOP engineering controls, combining high-tonnage mechanical demolition with certified environmental restoration.

Close-up of a heavy-duty black hydraulic scrap shear attachment mounted on an excavator boom at a steel structural demolition yard.
DIV-01 // STRUCTURAL SHEARING
COLD-CUTTING SPEC

Plant Decommissioning & Structural Demolition

Cold-cutting of heavy industrial steelwork, refineries, cement kilns, and tank farms using excavator-mounted hydraulic scrap shears. Eliminates hot-work ignition risks in volatile petrochemical zones.

1,200-Ton Cutting Force Request Method Statement →
A red hydraulic gantry lift system and mobile boom lift positioning a massive silver cylindrical industrial pressure vessel onto a multi-axle heavy transport trailer.
DIV-02 // ENGINEERED RIGGING
HEAVY GANTRY LIFT

Heavy Machinery Decommissioning & Vessel Rigging

Turnkey extraction of oversized boilers, fractionation columns, turbines, and stamping presses using hydraulic gantry lifts and multi-axle SPMT heavy transport trailers for intact asset remarketing or smelting.

400-Ton Hydraulic Gantry Book Lift Study →
An orange hydraulic multi-tine orange-peel grapple lifting twisted structural steel and metal scrap in an industrial dismantling yard.
DIV-03 // FERROUS & NON-FERROUS
METALLURGICAL SORTING

Ferrous & Non-Ferrous Material Recovery

High-speed orange-peel grapple sorting, XRF alloy verification, and high-density baling of HMS 1&2 carbon steel, 316L stainless, cast aluminum, and high-conductivity copper for direct foundry supply.

XRF Spectrometer Verified Estimate Scrap Rebate →
Environmental remediation crew and excavator working on contaminated soil excavation and testing at an industrial site.
DIV-04 // ECO-REMEDIATION
ISO 14001 CERTIFIED

Brownfield Soil Remediation & Stabilization

Hydrocarbon sludge removal, contaminated soil excavation, bio-remediation treatment, and groundwater table sampling to return decommissioned industrial sites to unrestricted regulatory clearance.

NESREA & LASEPA Certified View Site Clearance →
ASSET RECOVERY TELEMETRY

Scrap Value Offset & Carbon Credit Calculator

In most large-scale plant decommissioning projects, recovered ferrous and non-ferrous alloys offset 40% to 115% of total dismantling labor and rigging costs. Select your primary alloy stream to model commercial recovery and embodied CO₂ savings.

Commodity Preview
COMMODITY // MILLBERRY CU-99.9% High-Purity Compressed Copper & Alloys
LME INDEXED
Configure Plant Material Stream ISO-14040 LIFE CYCLE METRICS
250 MT
20 MT (Single Unit) 1,250 MT (Mid-Size Plant) 2,500 MT (Full Complex)
GROSS SCRAP VALUE $1,962,500 Commercial Credit
DISMANTLING COST EST. $118,750 Rigging & Shear Crew
EMBODIED CO₂ SAVED 1,050 MT Scope 3 ESG Certificate
NET CLIENT RECOVERY BALANCE: +$1,843,750 Payable to Client
Aerial view of multiple yellow excavators, bulldozers, and articulated dump trucks performing large-scale site grading and earthworks across a cleared brownfield site.
CASE STUDY // 14-HECTARE BROWNFIELD RECLAMATION
GREENFIELD HANDOVER CERTIFIED
Oxy-fuel cutting thick steel plate
PHASE 1 // HOT WORK

4,200 MT Furnace Plate Sectioning

Oxy-Fuel Heavy Lancing
Facility waste processing equipment
PHASE 2 // PROCESSING

Zero-Waste Material Recovery

99.2% Landfill Diversion
VERIFIED PROJECT DELIVERY

From Legacy Industrial Plant to Graded Greenfield Pad

When a 40-year-old manufacturing complex required full decommissioning for a new hyperscale logistics and data center park, Cleancycles Recovery Limited deployed an integrated fleet of hydraulic shears, thermal cutting crews, and civil earthmoving machinery.

STRUCTURAL STEEL RECOVERED: 11,450 Metric Tons (99.2% Recycled)
NON-FERROUS COPPER & ALUMINUM: 680 Metric Tons (Baled & Smelted)
SOIL REMEDIATED & GRADED: 85,000 m³ (NESREA Cleared)
SCHEDULE COMPLETION: 18 Days Ahead of Baseline
Request Full Engineering Dossier
ISO 45001 & 14001 WORKFLOW

4-Stage Industrial Decommissioning Protocol

STAGE 01

HAZOP & Metallurgical Assay

3D laser scanning, structural stability modeling, asbestos/NORM survey, and XRF alloy sampling to establish a guaranteed scrap buyback credit.

STAGE 02

Purging & LOTO Isolation

Complete Lockout/Tagout energy isolation, chemical line flushing, transformer oil draining, and gas-free certification prior to mechanical entry.

STAGE 03

Shearing, Rigging & Baling

Deployment of hydraulic shears, gantry cranes, and mobile balers. Segregated metals are weighed on calibrated weighbridges with digital chain-of-custody.

STAGE 04

Remediation & Handover

Sub-slab concrete breakout, soil remediation testing, engineered backfill grading, and issuance of NESREA/LASEPA Green Clearance Certificates.

TENDER & ENGINEERING DESK

Schedule an Industrial Site Audit or Scrap Tender

Submit your facility parameters below. Our field engineering team deploys across Lagos, Ogun, Port Harcourt, Warri, and international industrial zones within 48 hours for physical site inspections.

OPERATIONS COMMAND // RC 9744607 Victoria Island & Apapa Industrial Corridor, Lagos, Nigeria
DIRECT TENDERS & RFPs
CORPORATE PORTAL www.cleancycles.ng